how many labour can do cum of concrete

RATE ANALYSIS OF BRICKWORK – we civil engineers

Labour Cost:- Area=volume ... The plaster thickness of 20mm can be calculated from the density of the motar, which is 2200Kg/Cum. How to calculate the rate of bricks from bricks having dimension of 5inch x 10 inch x3incj height . ... Different Grades of Concrete and their Uses/Applications. How to calculate number of Bricks per Square meter (m2)


Contract Rates & Specifications for your Home Construction

T r i c o n B u i l d e r s – The Makers of India's Finest Designer Homes Page 1 Dated: 17.02.2021 Dear Sir/Madam, Thank you for downloading the details of our general home construction rates & Specifications. We would undertake to design and build any categories of …


CHB Laying — All you need to know (within 15 minutes ...

CHB Laying — All you need to know (within 15 minutes) — Part 1. I've had successes (and failures) after 5 years in the construction site. I'll share with you the good tips and tricks ...


Estimating Labor - tpub.com

ESTIMATING LABOR . This section briefly covers labor estimates for concrete masonry units according to the Seabee Planner's and Estimator's Handbook, NAVFAC P-405. Table 4-4 shows the labor table from the P-405 on how to estimate labor. When using this table, you will see that 8" x 8" x 16" block takes "one person" (skilled labor) 160 man-hours ...


HOW TO CALCULATE OUTPUT OF A CONCRETE MIXER? - …

The following example illustrates this. Find the working hour required to complete a concrete slab 30 m * 50 m 8 0.20 m size using 200 T mixer. With three minute cycle time for one complete operation, The output per hour = 20 * 180 = 3600 litres i.e. 3.6 cubic meters. So number of working hours = (30*50*0.2)/3.6 = 83.3 hours.


Analysis of rates for labour and material

3) Disposal of surplus earth within a lead of 30m (100')-1 mazdoor can do 2.83cum (100 cuft) per day. b) Cement concrete work per 2.83 cum (100cuft) laying cement concrete – 2 beldars, 3 mazdoors, ¾ bhisti and ¼ mason, can do 2.83 cum (100 cuft) per day.


How much labour is required for concrete placement when ...

Answer (1 of 4): There's no out of the book formulas to calculate this one. The minimum number of labours required would be at the least. These number are mostly apt for large slabs where there are multiple pours and shall not be necessary for small slabs. With the following or even lesser labour...


What Is In 1 Cubic Metre Mix of Concrete? [Infographic ...

What Is In 1 Cubic Metre Mix of Concrete? Concrete is one of the most versatile construction materials available, and by far the most popular. Used for an endless variety of building projects, there is a huge range of concrete mixes to suit specific applications, so the proportions of each mix need to be measured with precision.. If you need concrete for your project, call our team on 0800 859 ...


Rate Analysis Of Concrete - M25 Concrete Example Rate Analysis

Assume We need 1 m3 of wet volume concrete of M25 Mix, (Mix Ratio, M25 = 1: 1 : 2) So Total Parts = 1+1+2 = 4 Parts which gives Dry volume that means before adding water content. Volume of concrete = (1 Cement Part)/4 + (1 Sand Part)/4 + (2 Coarse Aggregate Part)/4. From the IS Code standard, Assuming the water-cement ratio for M20 is 0.5.


how much concrete can be poured in a day? | DIYnot Forums

At £500 it may be too expensive - I often use a pump to do as little as 3m3 because its a damn site easier and gives me more to time to work the concrete and get a good finish. The lads can be doing more useful things than barrowing Barrows of wet messy concrete about. (You'd only need one slip in a digger to loose a few cubes of concrete at ...


Quantity and Rate Analysis for Reinforced Concrete ...

Following are the percentage of reinforcement steel generally required per different components. Its values can vary from structure to structure, and can be assumed from past experiences of similar structure. For slabs = 1.0 % of concrete volume. For Beam = 2 % concrete volume. For column = 2.5 % of concrete volume. For RCC Roads, 0.6% concrete ...


transit mixer | Construction basics re-told

The concrete drum slowly rotates around its own axis so that the concrete does not become solid during the transit period. "The normal transit mixer has a capacity of carrying 6 cum of ready mix concrete " Small transit mixers of 4.5 CuM capacity as well as jumbo transit mixers with carrying capacity of 7.5 CuM. You already know:


Concrete Block Fill Calculator - Find CMU Fill Volume

The next step is to find the number of voids in the wall. This can be done by counting the number of blocks in the wall. Use our concrete block calculator to find how many blocks are in your wall. If each block has two voids then multiply the number of blocks by 2 to get the number of voids in the wall. Step 3: Find the Total Concrete Block ...


How much does a concrete slab cost in Johannesburg ...

To avoid manual pumping, you can hire a pump which costs an extra R5000; Labour costs are excluded and are worked out per quote with your contractor; The above prices are a general estimate. Contact [email protected] for an accurate discounted quote . When building a double-story new home?


CONCRETE VOLUME - cubic feet per 40lb bag

The approximate volume of concrete produced from a 40 pound bag is 0.3 ft³. To compute how many 40 lb bags of concrete is needed for a total volume, CLICK HERE.. Choose your volume units (e.g. cubic feet) Enter the volume (V) The calculator returns the number of 40 lb bags needed to mix that much concrete.


Rates Analysis For Calculating Material and Labour for ...

5. ANALYSIS OF RATES • Rates of Materials and Labours : • 1st class bricks = Rs 4500 per 1000 Nos. • 2nd class bricks = Rs 4000 per 1000 Nos. • Brick Ballast = Rs 800 per cum • Coarse sand = Rs 800 per cum • Cement 50 kg bag = Rs 270 per bag • Twisted bars = Rs 5000 per Quintel • Bitumen = Rs 10 per kg. 6.


concrete slab costs | Screwfix Community Forum

Hi i am looking at having a concrete slab for a workshop in my garden. Slab needs to be circa 6.3m's x 4.2m's. 4 cubic meters Does anyone have any ideas on how much it will cost, if i employed 3 labourers for a day to mix and pour the concrete. Cant get ready mix due to …


How to Calculate Staircase | Concrete & Bar Bending ...

The steps of the staircase resting on waist-slab can be made of bricks or concrete. How Do You Calculate Concrete Staircase Volume? Quantity Of Materials For Staircase: Volume of cement = 1/7 x Dry volume = 1/7 x 159 = 22.66 cubic feet. Volume of Sand …


Labour Requirement & Output Per Day For Different Civil Works

In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the material calculation for ...


How Much Does Saw Cutting Concrete Cost? | HowMuchIsIt.org

The charges for saw cutting concrete are usually dependent on the depth per linear foot. The outdoor cost, 1 to 1.5 inches in depth, can be about $0.60 per linear foot, while indoor cutting costs can around $1.50 per linear foot. However, the outdoor costs, with a depth of 16 inches, will cost about $5 per linear foot, while the indoor price is ...


Labor Requirement for Various Construction Works - The ...

S. No. Description of work: Unit: Labor: Recommended constant in days. 1) Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge): M 3: Mate Labor. 0.06 0.62. 2) Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal ...


2021 How much does concreting cost? | Cost guide 2021 ...

- $100 to $150 per square metre for a decorative stencilled concrete driveway. Labour rates vary throughout Australia, but on average, concreters charge about $67.50 per hour. While the rate sounds high, concreters use expensive equipment that speeds up the process and keeps the overall concrete cost per m2 or m3 down.


How much does concreting cost? | 2020 Cost Guide | Service ...

Concreting can cost $50 to $150 per square metre, subjective to the levelling required, type of finish used and size of the job. Per m3 you can expect to pay $200 to $300 per cubic metre. Spray on concrete costs $50 to $75 per square metre; Plain concrete costs $60 to $85 per square metre; Coloured concrete costs $100 to $150 per square metre


Vibration of concrete, Methods of concrete vibration, FAQs

Concrete shall never be poured in layers thicker than 600mm or 10times the dia of Poker. Once the concrete is poured, the immersion vibrator is inserted vertically into the concrete pour. Immersion vibrator can vibrate at a frequency of 15000rpm. It is recommended to keep the vibration between 3000rpm to 6000rpm with an acceleration of 4g to 10g.


Analysis & Rates, Analysis and rates for construction work ...

3) Disposal of surplus earth within a lead of 30m (100')-1 mazdoor can do 2.83cum (100 cuft) per day. b) Cement concrete work per 2.83 cum (100cuft) laying cement concrete – 2 beldars, 3 mazdoors, ¾ bhisti and ¼ mason, can do 2.83 cum (100 cuft) per day. c) R C C work:-


Rate analysis for concrete - calculate quantity and cost ...

1) Rate per cum for concrete M10 = INR 6839 2) Rate per sq m for concrete M10 = INR 1025 3) Rate per sq ft for concrete M10 = INR 97. Rate analysis for 1 cum concrete of M7.5 (1:4:8) M7.5 grade of concrete have cement, sand and aggregate ratio 1:4:8 in which one part is cement, 4 part is sand and 8 part is aggregate.


Calculate how much concrete you need with the Concrete ...

You can calculate how much concrete you need for your construction project using this calculator that works in both US Customary Units (feet and inches) and International System of Units or metric units (meters and centimeters) of measurement. Most concrete purchases will be made in cubic yards, which equates to 27 cubic feet.


CHAPTER 4 COST OF CONSTRUCTION LABOR AND EQUIPMENT

industries in the world. The labor cost component of a building project often ranges from 30 to 50%, and can be as high as 60% of the overall project cost. Therefore, it is clear that construction labor is a vital component of a construction project. A building is a very complex product, made up of many different systems, such as the


How much cement sand & aggregate required for M10 concrete ...

Ans. :- 222 Kgs quantity of cement required for 1 cubic metre of M10 concrete. How many cement bags required for M10 concrete step 6:- we know that 1 bag cement weight = 50 kgs,calculate cement bags required for 1 cubic metre of M10 concrete is equal to = 1/10 …


ArchiDesigners : Calculation of material and labour ...

Therefore, payment should be issued for labour for this work is 4.77 cu (Skilled labour days 4.77 and unskilled labour days 14.31). Note: 1cube = 100 cu.ft = 2.83 cum Typical Rubble Foundation Detail


Cost to Install Concrete Pad - 2021 Cost Calculator ...

Balance of 2 hr (s) minimum labor charge that can be applied to other tasks. For a basic project in zip code 47474 with 120 square feet, the cost to Install a Concrete Pad starts at $7.96 - $9.75 per square foot*. Actual costs will depend on job size, conditions, and options. To estimate costs for your project:


How Much Does Concrete Slab Cost? - Build It

A slab that size would need around 40m3 of concrete, assuming a depth of 300mm. A m3 of concrete costs between £65 and £85 depending on the specification, so budget between £2,600 and £3,500 for your slab, plus labour. Mike Hardwick, Build It expert. Log in to Reply. David Brookes says: